While it s not as important for our engineered hardwoods due to the stability in the way they are constructed solids will expand and contract considerably given the right conditions with wide changes in relative humidity levels.
Engineered flooring acclimation period.
We ve all heard someone in the flooring industry say the wood flooring must sit in the home to acclimate for a period of time before installation.
This is an.
Allow wood flooring to acclimate for at least three days.
Best practices for acclimating wood flooring.
There are all different answers from 5 days to 2 weeks or more.
Proper job site conditions acclimation and moisture testing the subfloor and new flooring and all work together for the success of the installation.
3 days of acclimation is recommended for engineered flooring.
All vinyl plank flooring has a high density fie core which is porous even when it looks solid.
The planks can remain in the box with the ends cut open for the duration of the acclimation period.
The period within which you will acclimate your floor depends on various factors such as the material of your ideal flooring geographic location current temperatures and humidity and expected climate changes.
I inspect a lot of flooring complaints and fill out a lot of manufacturer required forms.
Even with engineered flooring it is suggested by some manufacturers that in order to retain coverage with the warranty the job site has to be maintained between 30 50 relative humidity and these conditions must also be maintained after installation.
Maintaining the recommended acclimation levels after the installation will minimize board movement excessive squeaks and gaps.
Handle and unload hardwood flooring with care and store within the environmentally controlled site in which it is expected to perform.
Acclimation hardwood floors how long.
Engineered hardwood wood subfloor engineered hardwood is more dimensionally stable than solid so it doesn t usually need to be acclimated to the same extent as solid hardwood.
If the manufacturer recommends the wood flooring be acclimated before installation proceed as follows.
Duchateau recommends an acclimation period of 3 days for all our engineered hardwood flooring products.
Acclimation to the installation environment for solid wood floors should never be overlooked.
With some products you may have problems engaging the tongue and groove if it is acclimated to a higher moisture content.
When discussing delivery and installation dates with clients they are almost always under the impression that the wood flooring must sit in their home before installation.
Yes since engineered wood flooring is constructed from natural hardwood it requires acclimation.
The only way to achieve this is through acclimation.
Acclimation times vary by species and product but a rule of thumb is to acclimate wood floor products for at least three days.